List Project PT Artha Sakti Marco Engineering

NOCUSTOMERGROUPPROJECT
1PT Nutrifood Indonesia CibitungNUTRIFOOD 
aProject Piping  and  Installation Mesin Sugar Mill Machine
bProject Installation Piping Installation Piping  and  Tank
2PT YUASA BatteryYUASA GROUP 
aProject Conveyor Belt Conveyor 10 000
bProject Conveyor Radius Belt Conveyor 10 000
3PT ASIATECH JAPANASIATECH Corporation 
aProject M/E System
4PT REKAYASA INDUSTRIREKIN 
aProject Piping Piping  Manufactured Chrome 25 %
5PT Trimitra Baterai PrakasaYUASA GROUP 
aProject M/E Line W ET M/E Line W et
bProject Fume Scrubber Fume SCRUBBER PP
cProject WWTP WWTP
dProject M/E Grids Casting Grids Casting
eProject M/E Snake Conveyor Snake Conveyor
fProject Conveyor Assymbling Assembling Conveyor
gProject NOMOTO  Machine NOMOTO  Machine
hProject M/E Line Formation M/E Lie Formation
iProject M/E Wet Charghing Charging  Line
jProject SILO Silo 45 Ton
6PT Kakao  Mas GemilangMAYORA 
aProject Tank  and  Installation Piping Pre  Mixing Tank  5000  L
bProejct Installation Piping  and  Tank WTP Cap  5 M3
cProject Tank  and  Installation Piping Mixing Tank  5000  L
dProject Tank  and  Installation Piping Storage Tank  for Oil 10000L
eProject Tank  and  Installation Piping Mixing Tank  3000L
fProject Tank  and  Installation Piping Mixing Tank  2500L
7PT Oka (Kakao  )MAYORA 
aProject Screw Conveyor Screw Conveyor
bProject Installation Piping Installation Piping  for Liquor
cProject Tank  aand Installation Piping Tank  Liquor Cap  7000  L
8PT Mayora  Indah CibitungMAYORA 
aProject Central Kicthen System
bProject Tank  and  Installation Piping Glucose Tank  Cap  30000L
cProject Tank  and  Installation Piping Glucose Tank  for Truck   Cap  10000L
dProject Piping Intallation Piping  Condesate
eProject Hydrant Installation Pipa  Hydrant
9PT TORABIKA  Div INSTANTMAYORA 
aProject Tank  and  Installation Piping Concetrate Tank  25.000
bProject Dust  Collector Dust  Collector
cProject Piping Installation Piping  Concetrate
dProject Bagging System bagging System
eProject SILO Debora Silo 50 Ton
10PT TORABIKA GROUND 2MAYORA 
aProject Piping  Installation Installation Piping  and  Tank  20000L
bProject Movable Tank Moveable Tank
cProject Ducting Ducting