List Project PT Artha Sakti Marco Engineering
| NO | CUSTOMER | GROUP | PROJECT |
| 1 | PT Nutrifood Indonesia Cibitung | NUTRIFOOD | |
| a | Project Piping and Installation Mesin | Sugar Mill Machine | |
| b | Project Installation Piping | Installation Piping and Tank | |
| 2 | PT YUASA Battery | YUASA GROUP | |
| a | Project Conveyor | Belt Conveyor 10 000 | |
| b | Project Conveyor | Radius Belt Conveyor 10 000 | |
| 3 | PT ASIATECH JAPAN | ASIATECH Corporation | |
| a | Project M/E | System | |
| 4 | PT REKAYASA INDUSTRI | REKIN | |
| a | Project Piping | Piping Manufactured Chrome 25 % | |
| 5 | PT Trimitra Baterai Prakasa | YUASA GROUP | |
| a | Project M/E Line W ET | M/E Line W et | |
| b | Project Fume Scrubber | Fume SCRUBBER PP | |
| c | Project WWTP | WWTP | |
| d | Project M/E Grids Casting | Grids Casting | |
| e | Project M/E Snake Conveyor | Snake Conveyor | |
| f | Project Conveyor Assymbling | Assembling Conveyor | |
| g | Project NOMOTO Machine | NOMOTO Machine | |
| h | Project M/E Line Formation | M/E Lie Formation | |
| i | Project M/E Wet Charghing | Charging Line | |
| j | Project SILO | Silo 45 Ton | |
| 6 | PT Kakao Mas Gemilang | MAYORA | |
| a | Project Tank and Installation Piping | Pre Mixing Tank 5000 L | |
| b | Proejct Installation Piping and Tank | WTP Cap 5 M3 | |
| c | Project Tank and Installation Piping | Mixing Tank 5000 L | |
| d | Project Tank and Installation Piping | Storage Tank for Oil 10000L | |
| e | Project Tank and Installation Piping | Mixing Tank 3000L | |
| f | Project Tank and Installation Piping | Mixing Tank 2500L | |
| 7 | PT Oka (Kakao ) | MAYORA | |
| a | Project Screw Conveyor | Screw Conveyor | |
| b | Project Installation Piping | Installation Piping for Liquor | |
| c | Project Tank aand Installation Piping | Tank Liquor Cap 7000 L | |
| 8 | PT Mayora Indah Cibitung | MAYORA | |
| a | Project Central Kicthen | System | |
| b | Project Tank and Installation Piping | Glucose Tank Cap 30000L | |
| c | Project Tank and Installation Piping | Glucose Tank for Truck Cap 10000L | |
| d | Project Piping | Intallation Piping Condesate | |
| e | Project Hydrant | Installation Pipa Hydrant | |
| 9 | PT TORABIKA Div INSTANT | MAYORA | |
| a | Project Tank and Installation Piping | Concetrate Tank 25.000 | |
| b | Project Dust Collector | Dust Collector | |
| c | Project Piping | Installation Piping Concetrate | |
| d | Project Bagging System | bagging System | |
| e | Project SILO Debora | Silo 50 Ton | |
| 10 | PT TORABIKA GROUND 2 | MAYORA | |
| a | Project Piping Installation | Installation Piping and Tank 20000L | |
| b | Project Movable Tank | Moveable Tank | |
| c | Project Ducting | Ducting |